ALL REMODELINNG PROJECTS ARE PERFORMED TO THE CUSTOMERS REQUIREMENTS AND ALL REQUIRED PERMITS ARE OBTAINED AND POSTED. CAN DO PROJECTS FROM THE SMALLEST REPAIR TO A FULL BLOWN ADDITION. 

*********************************************************************************************

NISKAYUNA NY Project

Finished Kitchen Remodel - The Kitchen was gutted and Rewired for the new electrical requirements. Cherry cabinets were installed with a Cherry Crown Molding at Ceiling Juncture. Backsplash tiles are 3" x 5" Eased Edge Limestone with White / Grey Grout. Tiles behind Stove Area are 1" Square multi colored Glass with a 3/4" Glass Beaded trim edge. Countertops are 1-1/2" Canadian Granite. All new appliances were installed. Floor is 5/8" Stranded Bamboo T&G Flooring.

This was part of a major addition / renovation of a House in Niskayuna NY

FINISHED EATING AREA ROOM ADDITION - The new Addition is 12' Wide x 16' Long . There are 5' sliders on each side of the room as well as lots of Tilt-in windows. A Window seat was constructed at rear of room ( with two storage drawers beneath it) to look out over an inground pool. The ceiling is Beaded stained pine board and the floor is a continuation of the Stranded Bamboo flooring from the kitchen. Their is a small IPE deck (5' x 7') on the right side and a larger (12' x 12') IPE deck on the left side.

This was part of a major addition / renovation of a House in Niskayuna NY.

FINISHED EATING AREA Ceiling - The ceiling was drywalled and taped ( for air sealing) then the 1" x 6" Beaded Pine was Stained and installed. There is a molding trim applied at the wall ends of the ceiling. Window trim was fabricated, staing and installed as was the site built window sills.

This was part of a major addition / renovation of a House in Niskayuna NY.

Large IPE DECK - Deck is 12' x 12' with three steps to new concrete patio. Decking is 5/4" x 6" IPE and was installed on a diagonal with a Picture Frame edge. The diagonal was done so as to draw the eye to the landscaped rear yard and inground pool. The decking was installed with hidden clips. The stairs are done in the same manner and the Risers and side areas were done in AZEK (a plastic composite). The IPE was left natural so it will weather to a grey.

This was part of a major addition / renovation of a House in Niskayuna NY.

SMALL IPE DECK - Deck is 5' x 6' with one step to new concrete patio. Decking is 5/4" x 6" IPE and was installed on a diagonal with a Picture Frame edge. The disgonal was done so as to draw the eye to the landscaped rear yard and eating area. The decking was installed with hidden clips. The stairs are done in the same manner and the Risers and side areas were done in AZEK (a plastic composite). The IPE was left natural so it will weather to a grey.

This was part of a major addition / renovation of a House in Niskayuna NY.

New Front Entryway and Porch - The New front Entry consists of a New Mud Room Addition next to the garage and a New Front Porch and steps. The Mud Room is 8' x 12' and the Front Porch is 7' x 23' with a Formal Front door entry. The Porch decking is 5/4" x 6" IPE installed with hidden deck clips and a Picture Frame edge. The steps have IPE Treads and AZEK Risers. There are 4 Tapered Fluted Fiberglass Support columns.

This was part of a major addition / renovation of a House in Niskayuna NY.

BEADED CEILING on FORMAL ENTRY - The Ceiling on the Formal Front Door entry was made with an Slight Curve and covered in Beaded wood that was stained and sealed. The Dentil molding was fabricated on site to match the existing molding on the house. The Boxed side and Front beams were enclosed in Prime Trim and then painted with a white glossy paint as was all the exterior elements.

This was part of a major addition / renovation of a House in Niskayuna NY.